What this preparation path covers
- Masonry units, mortar, grout, and reinforcement
- Placement, consolidation, tolerances, and construction sequence
- Approved documents and required inspection checkpoints
- Clear deficiency notes and inspection records
HoldPoint study map
Course outline
Unit and lesson titles below are HoldPoint original material. They are not an official exam bulletin.
Materials, mortar, grout and units
Identifying masonry materials on site and catching substitutions before they are built in.
- Unit types, grades and the mark that has to be on the unit
- Mortar types and what the specification actually called for
- Grout: specified versus what arrived in the mixer
- Water, admixtures and retempering
- Storage, wetting and contamination of units
- Cold-weather and hot-weather masonry observations
- Prism and grout specimen interface
- Practice: identify eight material discrepancies
- Unit review: Materials, mortar, grout and units
Reinforcement, connectors and accessories
Bars, joint reinforcement, anchors and ties as installed, not as drawn in a typical detail.
- Vertical and horizontal reinforcement: size, location and cover
- Lap splices and mechanical splices in masonry
- Joint reinforcement versus bonded beam bars
- Connectors, anchors and ties to backing or framing
- Movement joints that were drawn and then ignored
- Lintels, bond beams and bearing details
- Missing accessories discovered at grout time
- Practice: check a wall elevation against the placing notes
- Unit review: Reinforcement, connectors and accessories
Placement, grouting and construction type
Low-lift versus high-lift, cleanouts, consolidation, and the construction type that changes the inspection.
- Bed joints, head joints and alignment you can still correct
- Low-lift grouting: lifts, consolidation and stoppages
- High-lift grouting: cleanouts, barriers and pour height
- Grout spaces that are too tight for the specified grout
- Rebar displacement during grouting
- Partially grouted walls and the cells that must actually be filled
- Construction type changes mid-wall
- Practice: choose the grouting inspection for six walls
- Unit review: Placement, grouting and construction type
Tolerances, frequencies and records
What is still the wall on the drawing, how often you must be there, and what the report has to capture.
- Plumb, level and alignment as inspectable conditions
- Course height and joint thickness without inventing a number
- Inspection frequency for masonry tasks
- Pre-grout inspection that cannot be faked afterward
- Daily reports during a multi-day wall
- Sample panels and mock-ups
- Photographs that actually prove grout fill
- Practice: write a pre-grout report from a photo description
- Unit review: Tolerances, frequencies and records
Deficiencies, repairs and coordination
Ungrouted cells, misplaced bars, and repairs that have to be inspected as new work.
- Ungrouted or partially grouted cells
- Broken units and chipped faces that affect the structure
- Moving a bar after the grout is in
- Engineer-directed repairs versus contractor patches
- Flashing and moisture details that are not your structural call
- Interface with the building inspector on the same wall
- Re-inspection after a failed grout lift
- Practice: route five masonry deficiencies
- Unit review: Deficiencies, repairs and coordination
Mixed review and exam navigation
Stems that mix materials, grouting type and frequency, and how to keep the classifications separate.
- How a masonry stem hides the construction type
- Mortar questions versus grout questions
- Frequency items that look like workmanship items
- Mixed set: cleanouts, cover and mortar type
- Timed retrieval across TMS 402/602
- What you do not design
- Final self-assessment
- Handoff to concrete and general-requirements courses
- Unit review: Mixed review and exam navigation
Fit check
Who this roadmap is for
Special-inspection personnel preparing for the Structural Masonry credential scope.
Always confirm the current ICC eligibility rules, exam outline, references, fees, and scheduling policies before purchasing materials or setting an exam date.
Study sequence
A controlled preparation roadmap
- 01
Verify the current program
Start with the official source links below. Record the current outline, permitted references, eligibility rules, and any application steps that apply to your route.
- 02
Map the reference set
Turn each published domain into a retrieval map. Practice where to look before trying to memorize isolated answers.
- 03
Build the Structural Masonry core
Study masonry units, mortar, grout, and reinforcement alongside placement, consolidation, tolerances, and construction sequence, then connect both to field decisions and documentation.
- 04
Practice under controlled timing
Use short lookup drills first, then mixed review. Track missed concepts and slow retrievals separately so each can be corrected.
- 05
Recheck before exam day
Return to the credentialing body for last-minute policy or reference changes. Do not rely on a third-party summary for current exam administration.
Primary sources
Verify current program facts
Exam outlines, editions, eligibility, fees, and administration policies can change. These credentialing-body pages are the authority; HoldPoint is an independent preparation provider.
- ICC certification and testingInternational Code Council
Common questions
Before you build a study plan
Is the ICC Structural Masonry Special Inspector course available now?
Not yet. The displayed planned price is a launch benchmark, not an active offer. Checkout remains disabled until the preparation product is published and its purchase configuration is reviewed.
Does this page establish eligibility for Structural Masonry?
No. Eligibility and exam administration are controlled by the applicable credentialing body. Use the official source links on this page to confirm the rules for your situation.
What should I verify before beginning?
Confirm the current exam outline, approved references, application requirements, fees, testing policies, and edition information directly with the credentialing body.
Is this the official exam outline?
No. The study map on this page is HoldPoint original material. Exam content, references, and administration are controlled by the credentialing body. Use the official source links on this page to confirm the current bulletin.