Preparation scope
What this preparation path covers
- Occupancy, construction type, and allowable building limits
- Means of egress, accessibility, and fire-resistance
- Structural provisions and plan-to-field verification
- Commercial inspection sequence and code navigation
HoldPoint study map
Course outline
Unit and lesson titles below are HoldPoint original material. They are not an official exam bulletin.
Public safety and special construction
Chapter 17 special inspections, fire and smoke protection features, and the procedural duties.
- Chapter 17: how special inspection is structured
- Special inspection of concrete construction
- Continuous versus periodic, resolved
- Structural steel and masonry special inspection
- Statement of special inspections
- Opening protectives in rated assemblies
- Penetrations and joints in rated assemblies
- Reporting and escalation duties
- Unit review: Public safety and special construction
Wall construction
Framing, bracing, sheathing, exterior walls and their fastening.
- Wood wall framing and stud sizing
- Wall bracing methods
- Connections and fasteners in wood construction
- Cold-formed steel framing
- Masonry wall construction
- Exterior wall coverings and weather resistance
- Fire-resistance of wall assemblies
- Practice: six wall assemblies, six first moves
- Unit review: Wall construction
Building planning
Occupancy, height and area, live loads and means of egress.
- Occupancy classification
- Minimum uniformly distributed live loads
- Height and area limitations
- Occupant load calculation
- Exit access, exit and exit discharge
- Accessibility provisions the inspector checks
- Construction type as an inspection input
- Practice: classify four buildings before opening a chapter
- Unit review: Building planning
Foundations and floor construction
Soils, footings, foundation walls and floor framing.
- Soils investigation and bearing capacity
- Footing and foundation requirements
- Foundation walls and dampproofing
- Concrete slabs on grade
- Floor framing and joists
- Floor sheathing and diaphragms
- Under-floor access and ventilation
- Practice: six foundation-interface observations
- Unit review: Foundations and floor construction
Roof construction and coverings
Roof framing, sheathing, coverings and drainage.
- Roof framing and trusses
- Roof sheathing and diaphragms
- Roof coverings by classification
- Roof drainage and secondary drainage
- Rooftop structures and equipment
- Attic ventilation and access
- Fire classification of roof assemblies
- Practice: five roof assemblies
- Unit review: Roof construction and coverings
Interior finishes, fire protection and administration
Finish classifications, the inspector’s interface with suppression, and the administrative duties that close the inspection.
- Interior wall and ceiling finish classification
- Decorative materials and furnishings
- Sprinkler system inspection interface
- Standpipe and alarm interface
- Smoke control interface
- Adoption, amendments and what you enforce
- Duties and powers of the building official
- Permits, plans, stop work and appeals
- Blueprint weightings and time budgeting
- Final self-assessment
- Unit review: Interior finishes, fire protection and administration
Fit check
Who this roadmap is for
Code officials and inspectors building a study plan for the B2 scope.
Always confirm the current ICC eligibility rules, exam outline, references, fees, and scheduling policies before purchasing materials or setting an exam date.
Study sequence
A controlled preparation roadmap
- 01
Verify the current program
Start with the official source links below. Record the current outline, permitted references, eligibility rules, and any application steps that apply to your route.
- 02
Map the reference set
Turn each published domain into a retrieval map. Practice where to look before trying to memorize isolated answers.
- 03
Build the B2 core
Study occupancy, construction type, and allowable building limits alongside means of egress, accessibility, and fire-resistance, then connect both to field decisions and documentation.
- 04
Practice under controlled timing
Use short lookup drills first, then mixed review. Track missed concepts and slow retrievals separately so each can be corrected.
- 05
Recheck before exam day
Return to the credentialing body for last-minute policy or reference changes. Do not rely on a third-party summary for current exam administration.
Primary sources
Verify current program facts
Exam outlines, editions, eligibility, fees, and administration policies can change. These credentialing-body pages are the authority; HoldPoint is an independent preparation provider.
- ICC certification and testingInternational Code Council
Common questions
Before you build a study plan
Is the ICC B2 Commercial Building Inspector course available now?
Not yet. The displayed planned price is a launch benchmark, not an active offer. Checkout remains disabled until the preparation product is published and its purchase configuration is reviewed.
Does this page establish eligibility for B2?
No. Eligibility and exam administration are controlled by the applicable credentialing body. Use the official source links on this page to confirm the rules for your situation.
What should I verify before beginning?
Confirm the current exam outline, approved references, application requirements, fees, testing policies, and edition information directly with the credentialing body.
Is this the official exam outline?
No. The study map on this page is HoldPoint original material. Exam content, references, and administration are controlled by the credentialing body. Use the official source links on this page to confirm the current bulletin.